INSPECTION
1. INSPECT STARTER ASSY
NOTICE: These tests must be performed within 3 to 5 seconds to avoid burning out the coil.

(a) Do the pull-in test.
If the clutch pinion gear does not move, replace the magnetic switch assy.

(b) Do the hold-in test.
Check that the pinion gear remains extended.
If the clutch pinion gear returns inward, replace the magnetic switch assy.

(c) Check the clutch pinion gear return.
If the clutch pinion gear does not return, replace the magnetic switch assy.

(d) Do the no-load performance test.
Torque: 10 NVm (102 kgfVcm, 7 ftVlbf)
Specified current: 90 A or less at 11.5 V
2. INSPECT RELAY (Marking: STARTER)

(a) Check the resistance of the STARTER relay.
Standard:

If the result is not as specified, replace the relay.
Overhaul
Starter ASSY (3MZ-FE)Cylinder head ASSY (2AZ-FE)
COMPONENTS
OVERHAUL
1. REMOVE VALVE LIFTER
HINT:
Arrange the valve lifters in the correct order.
2. REMOVE INTAKE VALVE
(a) Using SST and wooden blocks, compress and remove
the 8 valve spring retainer locks.
SST 09202-70020 (09202-00010)
(b) Remove the retainer, valve spring and v ...