1. INSPECT RELAY (Marking: FAN NO. 1, FAN NO. 3)
(a) Check the resistance of the relay.
Standard:
If the result is not as specified, replace the relay.
2. INSPECT RELAY (Marking: FAN NO. 2)
(a) Check the resistance of the relay.
Standard:
If the result is not as specified, replace the relay.
3. INSPECT ECT SWITCH (NO. 1)
(a) Check the resistance.
Standard:
If the result is not as specified, replace the switch.
NOTICE: When checking the ECT sensor in water, the terminals should be kept dry. After the check, dry the sensor.
4. INSPECT ECT SWITCH (NO. 2)
(a) Check the resistance.
Standard:
If the result is not as specified, replace the switch.
NOTICE: When checking the ECT sensor in water, the terminals should be kept dry. After the check, dry the sensor.
Starting & charging
SERVICE DATA
2AZ-FE
3MZ-FE
TORQUE SPECIFICATION
2AZ-FE
3MZ-FE
...