1. INSPECT INTAKE AIR CONTROL SYSTEM

(a) Using a 3-way connector, connect a vacuum gauge to the actuator hose.
(b) Connect the hand-held tester to the DLC3.
(c) Start the engine.
(d) On the hand-held tester, enter the ACTIVE TEST mode.
Standard:

InspectionNetwork gateway ECU
REPLACEMENT
HINT:
COMPONENTS: See page 67-2
Installation is in the reverse order of removal.
1. REMOVE GLOVE COMPARTMENT DOOR ASSY (SEE PAGE 71-10 )
2. REMOVE INSTRUMENT PANEL FINISH PANEL LOWER NO.2 (SEE PAGE 71-10 )
3. REMOVE NETWORK GATEWAY ECU
(a) Disconnect the connector.
(b) ...