1. REMOVE GENERATOR ASSY
(a) Remove the wire harness clamp.
(b) Disconnect the generator connector.
(c) Open the terminal cap, remove the nut and disconnect the generator wire.
(d) Loosen bolts A and B.
(e) Loosen bolt C to lessen the tension of the V belt.
(f) Remove bolts A and B, and the generator.
2. INSTALL GENERATOR ASSY
(a) Temporarily install the generator with bolts A and B.
(b) Adjust the V belt tension by tightening bolt C (see page 14-125 ).
(c) Tighten bolts A and B.
Torque: 58 NVm (592 kgfVcm, 43 ftVlbf) for bolt A 18 NVm (184 kgfVcm, 13 ftVlbf) for bolt B
(d) Install the generator wire with the nut.
Torque: 9.8 NVm (100 kgfVcm, 7.0 ftVlbf) (e) Connect the generator connector.
(f) Install the wire harness clamp.
3. INSPECT V BELT (See page 14-121 )
Starting system (2AZ-FE)
INSPECTION
1. INSPECT STARTER ASSY
NOTICE:
These tests must be performed within 3 to 5 seconds to
avoid burning out the coil.
(a) Do the pull-in test.
Disconnect the lead wire from terminal C.
Connect the battery to the magnetic switch as
shown in the illustration on the ...